Kompleks Sukan MBSP, Bertam, SPU
![]() |
Keluasan keseluruhan kawasan kompleks kira - kira 13.8 ekar.
|
![]() |
Tarikh dibina pada Januari 2000.
|
![]() |
Kos penyelenggaraan tahunan RM 100,000 setahun.
|
![]() |
Kos pembinaan RM 15 juta.
|
![]() |
Kos naik taraf (One Off) RM 6.6 juta.
|
![]() |
Dibina diatas sekeping tanah atas lot 2462 Mk. 6 Kepala Batas, SPU.
|
KADAR BAYARAN
|
KEMUDAHAN
|
KADAR BAYARAN
|
||
Biasa (RM)
|
Konsesi (RM)
|
||
1.
|
Dewan Besar
|
||
4 Jam (Siang)
|
600.00
|
450.00
|
|
1 Jam (Malam)
|
200.00
|
150.00
|
|
8 Jam (Harian)
|
900.00
|
675.00
|
|
Bilik VIP (Harian)
|
150.00
|
112.50
|
|
2.
|
Badminton
|
||
2 Jam (Siang)
|
20.00
|
Tiada
|
|
2 Jam (Malam)
|
20.00
|
Tiada
|
|
3.
|
Hoki
|
||
2 Jam (Siang)
|
50.00
|
37.50
|
|
2 Jam (Malam)
|
300.00
|
225.00
|
|
8 Jam (Harian)
|
200.00
|
150.00
|
|
4.
|
Bola Jaring
|
||
2 Jam (Siang)
|
60.00
|
45.00
|
|
8 Jam (Harian)
|
200.00
|
150.00
|
|
5.
|
Bola Sepak
|
||
2 Jam (Siang)
|
100.00
|
75.00
|
|
2 Jam (Malam)
|
200.00
|
150.00
|
|
8 Jam (Harian)
|
300.00
|
225.00
|
|
6.
|
Boling Padang
|
||
2 Jam @ 1 Rink (Siang)
|
10.00
|
Tiada
|
|
2 Jam @ 1 Rink (Malam)
|
15.00
|
Tiada
|
|
7.
|
Trek Sintetik / Alatan Balapan
|
||
4 Jam (Siang)
|
100.00
|
75.00
|
|
8 Jam (Harian)
|
250.00
|
187.50
|
|
8.
|
Bilik Mesyuarat (Tingkat Atas)
|
||
4 Jam (Siang)
|
50.00
|
37.50
|
|
8 Jam (Harian)
|
100.00
|
75.00
|
|
9.
|
Bilik Seminar (Tingkat Atas)
|
||
4 Jam (Siang)
|
100.00
|
75.00
|
|
8 Jam (Harian)
|
150.00
|
112.50
|
|
10.
|
Gimnasium
|
||
2 Jam (1 Sesi)
|
5.00
|
Tiada
|
|
Bawah Umur 18 Tahun
|
2.00
|
Tiada
|
|
11.
|
Tenis
|
||
2 Jam (Siang)
|
15.00
|
Tiada
|
|
2 Jam (Malam)
|
30.00
|
Tiada
|
|
12.
|
Bilik VIP (Hoki Dan Bola Sepak)
|
||
Harian
|
60.00
|
45.00
|